To establish a level line around a building you ll need a surveyor s level an accurate laser level or a water level.
Leveling siding starter strip.
Description documents this vinyl starter strip is used prior to installing the first row of siding and helps keep siding level and straight.
Below the top of the foundation but the lower the vinyl siding is installed the better.
This is where the new siding will begin.
Pull a measurement down from the soffit.
A hand level won t cut it and how do you level a chalk line.
If it is only 1 to 2 inches out of level this should not matter because most starter strip is 3 1 2.
A water level is simply a clear plastic hose or regular hose with clear ends with water in it.
Remember to make sure the sheathing is smooth before you apply the siding so the siding can be smooth also.
For the remaining vinyl siding panels to be installed correct and level beginning with the lowest row you must install the starter strip correctly.
You attach the bottom of the first row of siding to the top of this starter strip.
Then find your lowest point of the home.
A line level isn t accurate enough.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Georgia pacific 3 5 in x 10 ft galvanized steel galvanized steel vinyl siding starter strip.
This way you will always end level with your soffit.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
What is the best way to determine a level line on the exterior of your house over 20 to 50 feet.
It protects the sheathing from rain snow and pests.
Pull this same measurement on each corner.
Vinyl siding starter strips.
You will still be able to attach it to the wall sheathing.
Cellwood vinyl starter strip is a required accessory to start any vinyl siding installation job.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.